Redmond Gary Australia will rebuild EWP’s to Australian Standards in accordance with customer demands. Rebuilds are quoted on fixed and variable price basis for all major stages of rebuilds.

Stage 1: Is inspection of EWP prior to dismantling to gauge the machine’s performance.

Stage 2: Strip down EWP

  • Completely dismantle EWP
  • Crack test all structural elements including hydraulic cylinders, booms, subframe, etc.
  • Repair and repaint as required

Stage 3: Component replacement or repair. Redmond Gary engineers will recommend components that need to be repaired or replaced and the customer will decide what is required.

Stage 4: Before Reassembly the customer will order extra cost items

  • Upgrade to Australian Standard AS1418.10-2011
  • Add options not supplied in the original build
  • Have the EWP mounted on a new cab chassis
  • Add efficiency improvements
  • Carry out all safety upgrades

Stage 5: Reassemble the EWP including

  • Refurbishment of fibreglass surfaces
  • Replace all electrical wiring
  • Replace all hydraulic hoses

Stage 6: Test the EWP in accordance with Australian Standards and Redmond Gary Australia’s stringent testing regime

Stage 7: Electrical test EWP with ratings of up to a maximum of 132kV, in accordance with customer’s demands.

Stage 8: Provide rebuild test report including:

  • Engineering certificate for fly jib
  • Engineering certificate for turret insert
  • Engineering certificate for levelling rod
  • Stability test report
  • Electrical test report
  • Detailed checklist for the complete EWP
  • Independent crack test report with photos complete with EWP
  • EWP manufacturer's report
  • New EWP Operation Service and Parts Manual

RG - Fly Boom

Fly boom being structurally tested

RG - Turret

Turret insert being structurally tested

10 YEAR REBUILD BEFORE AND AFTER PHOTOS

Before After
RG EWP 10 Year Rebuild before image 1 RG EWP 10 Year Rebuild after image 1
RG EWP 10 Year Rebuild before image 2 RG EWP 10 Year Rebuild after image 2
RG EWP 10 Year Rebuild before image 3 RG EWP 10 Year Rebuild after image 3
RG EWP 10 Year Rebuild before image 4 RG EWP 10 Year Rebuild before image 4 - 2 RG EWP 10 Year Rebuild after image 4

15 YEAR REBUILD BEFORE AND AFTER PHOTOS

Before After
RG EWP 15 Year Rebuild before image 1 RG EWP 15 Year Rebuild after image 1
RG EWP 15 Year Rebuild before image 2 RG EWP 15 Year Rebuild after image 2